Transforming Communcation System Installation, Making Life Easier.
New Dimension
AES have recently delivered the fully integrated vehicle electrical, data and communication systems for the New Dimension Project which was procured by the Office of the Deputy Prime Minister (ODPM) under a framework agreement with Marshall SV of Cambridge. The systems are integral to UK National Resilience supplying the UK Fire Service with a fleet of vehicles that have an enhanced operational capability. Please see our case studies page for more information
Design Services
AES design integrated vehicle systems. All elements are considered from the user requirement, this includes communication equipment. Power management, EMC, wiring harnesses and suppression issues are dealt with in a systematic
Support Services.
During the design process AES design engineers prepare Build Standards, Fault Effects Mode Analysis (FEMA) matrices, Health and Safety Revues and Technical Publications as prescribed by the AES project management methodology and ISO 9001 registration.
This work enables AES to claim a full Integrated Logistical Support (ILS) system.
AES support assistants manage clients needs. Full account is given to failure trend analysis, terminal management and warranty issues. All systems are supported in the field by specialist technicians trained in all aspects of platform system diagnostics.
Capabilities.